Complete Project List

All company projects from the Company Profile catalog

Showing 20 of 168 projects

Project Client Location Sector Category Year Status Description
(EPC Contract) Indigenous Design, Manufacturing, Installation, Testing and Commissioning Of TRCM Machine for LARAIB Energy Hydropower Azad Kashmir) WAPDA — Mechanical & Electrical Hydropower 2007 Completed (EPC Contract) Indigenous Design, Manufacturing, Installation, Testing and Commissioning Of TRCM Machine for LARAIB En…
/ Repair to intake gates of warsak Dam (Hydel) North, 12 months 1990 Completed — — S No Name of Project Client Total Time Remarks — 1989 Completed —
12 Km Road from Thana Bypass to Chakdara Including Bridges Pakhtunkhwa Highways Authority / C&W Department Thana Bypass to Chakdara Civil & Bridges Road 2016 Completed Construction of 12 km road from Thana Bypass to Chakdara including bridges.
12 Km Road from Thana Bypass to Chakdara Including Bridges Pakhtunkhwa Highways Authority / C&W Department Thana Bypass to Chakdara Civil & Bridges Road 2016 Completed Construction of 12 km road from Thana Bypass to Chakdara including bridges.
16 Km Long Access Road to Munda Headworks Including Internal Roads Irrigation Department Munda Headworks, Charsadda Civil & Bridges Headworks 2015 Completed Construction of 16 km access road to Munda Headworks including internal roads.
16 Km Long Access Road to Munda Headworks Including Internal Roads Irrigation Department Munda Headworks, Charsadda Civil & Bridges Headworks 2015 Completed Construction of 16 km access road to Munda Headworks including internal roads.
1st Rehabilitation of Warsak power house Water and Power Development Authority Warsak, Peshawar Mechanical & Electrical Hydropower 2002 Completed Fabrication and installation of water treatment plant to provide processed water to turbine shaft seals at Warsak Power…
Ashuran Hydropower Project: Rehabilitation and Commissioning of Complete Power House Sarhad Hydel Development Organization (SHYDO), Govt of NWFP, Peshawar — Hydel & Thermal Hydropower 1991 Completed Rehabilitation project: installation, testing and commissioning of complete power house including electrical, mechanical…
Ashuran Hydropower Project: Rehabilitation and Commissioning of Complete Power House Sarhad Hydel Development Organization (SHYDO), Govt of NWFP, Peshawar — Hydel & Thermal Hydropower 1991 Completed Rehabilitation project: installation, testing and commissioning of complete power house including electrical, mechanical…
Authority — — Communication & — — Completed —
b) Modification / Repairs to Draft Tube Gates of Warsak Dam WAPDA Warsak — — S No Name of Project Client Total Time Remarks — — Completed —
Bio Gas Plant at Harichand Agricultural Engineering, Tarnab Harichand Agricultural Engineering, Tarnab Tarnab Mechanical & Electrical Industrial 1983 Completed Design, fabrication and erection of 3,000 cft bio gas plant.
Bio Gas Plant at Harichand Agricultural Engineering, Tarnab Harichand Agricultural Engineering, Tarnab Tarnab Mechanical & Electrical Industrial 1983 Completed Design, fabrication and erection of 3,000 cft bio gas plant.
Bio Gas Plant Project: Design, Fabrication and Erection throughout NWFP Ministry of Petroleum and Natural Resources, Islamabad NWFP Mechanical & Electrical Industrial 1985 Completed Design, fabrication and erection of bio gas plants throughout NWFP.
Bio Gas Plant Project: Design, Fabrication and Erection throughout NWFP Ministry of Petroleum and Natural Resources, Islamabad NWFP Mechanical & Electrical Industrial 1985 Completed Design, fabrication and erection of bio gas plants throughout NWFP.
Central Library Building and Air-Conditioning, Gomal University, D.I. Khan Gomal University, D.I. Khan D.I. Khan Buildings Institutional 1986 Completed Construction of central library building and air-conditioning civil works at Gomal University.
Central Library Building and Air-Conditioning, Gomal University, D.I. Khan Gomal University, D.I. Khan D.I. Khan Buildings Institutional 1986 Completed Construction of central library building and air-conditioning civil works at Gomal University.
Cherat Cement Factory: Erection of Main Raw Mill Section (300 ton) Descon Engineering Ltd., Lahore Cherat, Nowshera Mechanical & Electrical Industrial 1984 Completed Erection of main raw mill section with all relevant electrical and mechanical systems at Cherat Cement Factory.
Cherat Cement Factory: Erection of Main Raw Mill Section (300 ton) Descon Engineering Ltd., Lahore Cherat, Nowshera Mechanical & Electrical Industrial 1984 Completed Erection of main raw mill section with all relevant electrical and mechanical systems at Cherat Cement Factory.
Cherat Electric Power Station: Installation, Erection and Commissioning of 18.9 MVA Power House Siemens Pakistan Engineering (Pvt) Ltd, Islamabad Cherat, Nowshera Hydel & Thermal Thermal Power 1996 Completed Installation, erection and commissioning of 18.9 MVA power house for Cherat Electric Company.